翻訳と辞書 |
Rail transport in Bangkok : ウィキペディア英語版 | Rail transport in Bangkok
Rail transport was introduced to Bangkok in 1893, with the opening of the private Paknam Railway linking Bangkok to Samut Prakan. The national railway network was subsequently developed and first opened in 1896, linking Bangkok to Nakhon Ratchasima and then expanding to reach Chiang Mai, Nong Khai, Ubon Ratchathani and Su-ngai Kolok. Electric trams served the city from 1894 to 1968, but further intra-city rail transport remained undeveloped until the opening of the country's first rapid transit system, the BTS Skytrain, in 1999. The MRT subsequently opened in 2004, and the Airport Rail Link began operation in 2010. == Inter-city and commuter rail ==
In the late 1800s and early 1900s, King Rama V eagerly built a tram network for Bangkok by employing foreign engineers and technicians, especially Danish engineers. In fact, Bangkok had electric trams before Copenhagen. However, due to a lack of interest and maintenance the tram network was completely scrapped in 1968. Bangkok is the location of Hua Lamphong Railway Station, the main terminus of the national rail network operated by the State Railway of Thailand (SRT). Trains travelling on the Northern Line to Chiang Mai, the Northeastern Line to Nong Khai and Ubon Ratchathani, and the Eastern Line to Aranyaprathet originate at the station, and so do some trains of the Southern Line, which terminates at Su-ngai Kolok and has a connection to Malaysia (the other Southern terminus is Thonburi). In addition to long-distance services, the SRT also operates a few daily commuter trains running from and to the outskirts of the city during the rush hour, but passenger numbers have remained low.
抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Rail transport in Bangkok」の詳細全文を読む
スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース |
Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.
|
|